• Login
    View Item 
    •   Harambe University Digital Library Home
    • E-Book
    • Thesis and Dissertation
    • View Item
    •   Harambe University Digital Library Home
    • E-Book
    • Thesis and Dissertation
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    “CAUSE AND EFFECT OF PUBLIC CONSTRUCTION PROJECT DELAYS: THE CASE OF ADAMA CITY ADMINSTRATION”

    Thumbnail
    View/Open
    Final thesis TG12-1 (1).doc (3.093Mb)
    Date
    2022
    Author
    Girma, Tigist
    Metadata
    Show full item record
    Abstract
    The main purpose of the study was to identify the main causes of delay that affect the smooth completion of public building construction projects in Adama City. Construction Projects were becoming complex due to time overrun and cost overrun. This overrun sometimes results either in delay and incompletion of any other such difficulties. In this study the sample selected from total population of the study area which accounts 100 of which 80 samples were selected by using purposive sampling method. The questioners were distributed for 80 samples of which only 70 respondents were replied this means the response rate were 87.5% In Ethiopia construction industry traditional approach was predominantly in vogue in almost all of the projects. Identification of critical success factors would be helpful to formulate effective strategies for minimizing the cost of Construction Projects. The research design employed was descriptive in its nature. Both primary and secondary data sources were used to collect data, the questionnaire and interview were used as a tool to gather data from primary sources. Secondary data was to be accessed from key informants such as contractors, consultants and suppliers, involving stakeholders at the planning stage of the project. The finding of the study shown that time overrun and cost overrun were the two most common effects of delays in construction project. Data were analyzed using Statistical Package for Social Sciences (SPSS version 24) and results presented in frequency tables in addition content analysis method of data analysis were used . The main purpose of the study was to identify the main causes of delay that affect the smooth completion of public building construction projects in Adama City. Construction Projects were becoming complex due to time overrun and cost overrun. This overrun sometimes results either in delay and incompletion of any other such difficulties. In this study the sample selected from total population of the study area which accounts 100 of which 80 samples were selected by using purposive sampling method. The questioners were distributed for 80 samples of which only 70 respondents were replied this means the response rate were 87.5% In Ethiopia construction industry traditional approach was predominantly in vogue in almost all of the projects. Identification of critical success factors would be helpful to formulate effective strategies for minimizing the cost of Construction Projects. The research design employed was descriptive in its nature. Both primary and secondary data sources were used to collect data, the questionnaire and interview were used as a tool to gather data from primary sources. Secondary data was to be accessed from key informants such as contractors, consultants and suppliers, involving stakeholders at the planning stage of the project. The finding of the study shown that time overrun and cost overrun were the two most common effects of delays in construction project. Data were analyzed using Statistical Package for Social Sciences (SPSS version 24) and results presented in frequency tables in addition content analysis method of data analysis were used .
    URI
    http://197.156.112.159:80//handle/123456789/1676
    Collections
    • Thesis and Dissertation

    ሐራምቤ ዩኒቨርሲቲ
    HARAMABEE UNIVERSITY
    Contact Us | Send Feedback

    Tel: +251-221-118-316/71-72

    Fax: +251-221-118-294

    Website: www.harambeeuniversity.edu.et

    Email: info@harambeeuniversity.edu.et

     

     

    My Account

    Login

    ሐራምቤ ዩኒቨርሲቲ
    HARAMABEE UNIVERSITY
    Contact Us | Send Feedback

    Tel: +251-221-118-316/71-72

    Fax: +251-221-118-294

    Website: www.harambeeuniversity.edu.et

    Email: info@harambeeuniversity.edu.et